Sign up to receive a text message or email when new bids are added!
Bid Title: |
RFQ Set - Berth 1 Advance Bollard Order
|
Category: |
Construction / Engineering |
Status: |
Awarded |
Bid Recipient: |
Jose Soler |
|
Sealed Proposal for Berth 1 Bulkhead Replacement – Advanced Material Order – Bollards at the Port of Palm Beach will be received by the Owner, PORT OF PALM BEACH DISTRICT, until 2:00 p.m., local time on Friday, March 22, 2019, at One East 11th Street, Riviera Beach, Florida 33404, 6th Floor Conference Room.
|
|
3/12/2019 12:00 AM
|
|
Open Until Contracted
|
|
03-21-2019
|
|
All questions requiring clarification or interpretation of the Bidding Documents shall be made in writing and shall reach the Engineer at least seven (7) business days prior to the date for receipt of Bids. Do not contact Owner with questions. Direct all requests to the attention of Mr. J. Casey Long, PE, at Kimley-Horn and Associates. Casey.long@kimley-horn.com or 561-840-0838.
|
|
|
|
Return To Main Bid Postings Page